Stanton — WHEN: 8 a.m. until 4 p.m., Monday through Friday, pending weather. Monday, April 4 through mid-August
WHERE: SR 7/Stanton-Christiana Road from the Bridge over Churchmans Road to South Jane Way
WHAT: DelDOT’s contractor, Diamond Materials Inc., will be doing sidewalk construction, ADA curb work, and concrete island medians. Motorists should be aware that workers will be operating in close proximity to the travel lanes and anticipate minor traffic delays. [More]
The post TRAFFIC ALERT – Concrete Work Will Require Daytime Shoulder Closures on SR 7/Stanton-Christiana Road appeared first on Delaware Chronicle.